Reconstruction

What happens after dry-out — scope, timeline, permits, upgrades, and where Construction RX handles capital projects.

What happens after mitigation?

Once moisture levels are restored to dry standard, we scope rebuild: drywall, flooring, paint, cabinetry, trim. Insurance-scope rebuild stays with Aqua Master; capital upgrades route to Construction RX.

How long does reconstruction take?

Most insurance-scope rebuilds run 2–6 weeks depending on materials lead time. Larger losses or full-floor rebuilds run 8–16 weeks.

Can I upgrade materials during repairs?

Yes — insurance pays the like-kind-and-quality base; you pay the upgrade delta. We coordinate the full job so there are no seams between insurance scope and your upgrades.

Can you handle a whole-home rebuild after a major loss?

Yes — our sister company Construction RX manages whole-home rebuilds, remodels, and capital projects. We hand off seamlessly with documentation and history.

What permits are required for reconstruction in NE Ohio?

Most insurance-scope cosmetic work doesn't require permits; structural, electrical, plumbing, and large remodels do. We pull permits as part of scope.

Is there a warranty on reconstruction?

Yes — 1-year workmanship warranty on all reconstruction. Material warranties pass through from manufacturers.

Why has my rebuild stalled after dry-out — what's missing?

Usually the carrier hasn't approved the rebuild scope yet, or supplemental items (cabinets, custom millwork) are still in pricing. We push supplements weekly and keep a transparent schedule so you see exactly where the holdup is.

My carrier only covers one room of flooring but the rest doesn't match — what now?

Ohio has a 'matching' provision for continuous flooring; we document the existing material, source the discontinued style, and write a supplement for continuous-area replacement. Most carriers approve once we provide photos and SKU documentation.